Future Construction Projects

‹ All City Construction Projects

Future projects are adopted or programmed capital improvements that have not yet moved into confirmed active design, procurement, construction, or implementation. Expand a category below to review planned work and FY 2026-27 funding.

Last updated August 2026.

About project amounts: Amounts shown are adopted CIP budgets or programmed amounts. They are not construction contract awards or final project costs. A programmed scope describes the intended use of funding and does not mean that work has started.

Project Location / CIP FY 2026-27
South Mountain Trail Street Rehabilitation
Design and street rehabilitation.
Lowell Avenue to Orange Grove Avenue
SR-26001
$492,660
Kaia Lane Street Rehabilitation
Design and street rehabilitation.
Arno Drive to the cul-de-sac
SR-26002
$126,810
Monterey Lane Street Rehabilitation
Design and street rehabilitation.
Sierra Madre Boulevard to the cul-de-sac
SR-26003
$455,112
Auburn Lane Street Rehabilitation
Design and street rehabilitation.
Auburn Lane
SR-26004
$200,160
Las Rocas Drive Street Rehabilitation
Design and street rehabilitation.
Sycamore Place to Canon Drive
SR-26005
$208,800
Orange Drive Street Rehabilitation
Design and street rehabilitation.
Canyon Crest Drive to Skyland Drive
SR-27001
$283,284
Valle Vista Drive Street Rehabilitation
Design and street rehabilitation.
Valle Vista Drive
SR-27002
$444,600
Street Rehabilitation Program Total $2,211,426

Street projects are funded through multiple transportation and capital funding sources.

Project Active Transportation Improvements
CIP FA-27001
Location Citywide
Programmed work Bicycle parking, bicycle-lane improvements, crosswalk-safety enhancements, and regional bus-stop improvements.
FY 2026-27 amount $75,000
Funding source Transportation Fee

Annual Water Main Replacement Program

CIP WS-26001 provides $2,523,000 in FY 2026-27 for water-main replacement work at multiple locations. Future work includes South Mountain Trail, West Carter Avenue work coordinated with the Meadows project, and West Grand View Avenue.

The $2,523,000 amount is the annual program budget and also includes the active Lima Street project. It should not be interpreted as funding reserved exclusively for the future segments listed above.

Project Location / CIP FY 2026-27
Water Main Lining Project
Design and trenchless lining of water mains with recurring leaks where full excavation is difficult.
Citywide
WS-27001
$300,000
Water Main Plant Pump Station
Design for replacement of the non-operational water-system pump station.
621 E. Sierra Madre Boulevard
WS-27004
$150,000
Design
Well No. 6 Rehabilitation
Removal and evaluation of the pump assembly followed by necessary rehabilitation or repair.
611 E. Sierra Madre Boulevard
WS-26007
$200,000

The Water Main Plant Pump Station CIP programs an additional $1,350,000 in FY 2027-28 for construction and related costs.

Project Wastewater Infrastructure Improvements
CIP WW-27001
Programmed work Replacement or rehabilitation of aging sewer mains and manholes, with priority locations and rehabilitation methods informed by sewer-system planning.
FY 2026-27 amount $100,000
Funding Sewer Enterprise Fund

The CIP programs an additional $100,000 in FY 2027-28.

Project Location / CIP FY 2026-27
Community Center Elevator
Repair or replacement of the elevator serving the Recreation Center and second-floor access.
611 E. Sierra Madre Boulevard
FA-26001
$750,000
Aquatic Center Pool and Deck Resurfacing
Repair of the main pool deck and plaster surfaces of the main and small pools.
611 E. Sierra Madre Boulevard
FA-26002
$324,050
Lizzie's Trail Inn and Richardson House
Structural stabilization, roofing replacement, tree-interference work, and preservation.
167 E. Mira Monte Avenue
FA-26003
$138,216
Carryover
City Hall ADA Parking Spaces
Design and construction of accessible parking improvements.
City Hall parking lot
FA-27002
$50,000
Listed Public Facility Amounts $1,262,266

Project City Yard Backup Generator
Location 621 E. Sierra Madre Boulevard
CIP WS-27006
Programmed work Design for replacement of the non-operational stationary backup generator.
FY 2026-27 amount $175,000, design
Funding Water Enterprise Fund

The CIP programs an additional $1,575,000 in FY 2027-28 for construction and related costs. The project retains its WS-27006 CIP designation even though it is presented here under Emergency Power.